Construction of Staff Colony Compound Wall, at 2.75 MTPA Green Field Cement Plant at Chatrasala in Gulbarga District of state of Karnataka, which involved earth work excavation in Hard Rock as well as Black Cotton soil and PCC in CM (1:4:8) prop using 40mm metal, Random rubble stone masonry in CM (1:6) proportion in portions below the ground including curing, Random rubble stone masonry in CM (1:6) proportion in portions above the ground including curing, Providing and laying of locally available brick masonry 230mm and above thick in Cement Mortor 1:4 proportion in superstructure including raking out joints, curing etc, Supply fabrication and installation of 50 x 50 x 6 MS angle as per design including painting with synthetic enamel paint in 2 coats over a primary coat of red oxide, supply and fixing of GI barbed wire fencing of guage 14/16 on the top of the compound wall as per design, damp proof course (DPC) with 12mm granite material and coping with 12 mm thick granite material.